Instrumentation and monitoring

Monitoring of settlement, ground movement and groundwater conditions. Select the instruments and reading schedule for the investigation or construction works.

What it tells the engineer

Instruments installed in the ground track how it responds to construction: settlement markers and plates, inclinometers for lateral movement, and piezometers for groundwater pressure.

When it is used

Embankments on soft ground, deep excavations, slopes, and structures next to construction works.

How a job runs

  1. 1

    Brief

    Your site, the structure and what the design needs to know.

  2. 2

    Plan

    Test locations, methods and the reporting you need.

  3. 3

    Fieldwork

    Testing, drilling and sampling on site by our field team.

  4. 4

    Report

    Logs, plots and test results for your engineer.

Typical outputs

  • Instrument installation records
  • Baseline and periodic readings
  • Trend plots against your alert levels
  • Monitoring reports

Questions

How often are readings taken?

The schedule follows the construction stage and the project's monitoring plan; we agree it with you before installation.

Tests in this family

  • Inclinometer Monitoring

    Inclinometer monitoring records changes in inclination to assess lateral movement with depth. Results support…

  • Piezometer Monitoring

    Piezometer monitoring measures groundwater level or pore-water pressure, depending on the instrument. The typ…

  • Ground Settlement Monitoring

    Settlement markers and plates read over time to track ground movement.