NattestGeo crawler CPT rig on site

Ground investigation and land survey

Site data for safer foundations and better design: CPT, boreholes, in-situ testing, survey and monitoring, with soil testing at NatTest Lab.

How it works

From site to report

  1. 1

    Brief

    Your site, the structure and what the design needs to know.

  2. 2

    Plan

    Test locations, methods and the reporting you need.

  3. 3

    Fieldwork

    Testing, drilling and sampling on site by our field team.

  4. 4

    Report

    Logs, plots and test results for your engineer.

Equipment

DYLC-Z25-X crawler CPT rig

A fully hydraulic, tracked rig that uses its own weight for reaction, built for cone penetration testing on soft and difficult ground.

CPT and CPTU
DYLC-Z25-X crawler CPT rig on site
Specifications
Rated penetration force200 kN
Rated lifting force250 kN
Stroke1,100 mm
ChassisTracked crawler, 600 mm tracks
Weight20 t including counterweight
Cone sizes10 cm² and 15 cm²
Power88 kW

Supplier catalogue specification.

In the field

NattestGeo on site

Blue enclosed crawler CPT rig on sandy ground, viewed from the hydraulic end with the side door open and support legs loweredBorehole drilling rig on siteEngineering survey with a total station and GNSS on siteReading a piezometer at a borehole casing

Planning a site investigation?

Share the site location, the structure and what you need to know.